Hydroflux will be installing a 25ML Covered Anaerobic Lagoon (CAL) as part of an upgrade to a client’s existing wastewater treatment plant system. The CAL has been designed to handle up to 4 Megalitres (ML), or 4 million litres, a week...
Hydroflux will be installing a 25ML Covered Anaerobic Lagoon (CAL) as part of an upgrade to a client’s existing wastewater treatment plant system. The CAL has been designed to handle up to 4 Megalitres (ML), or 4 million litres, a week...